Facts 

Name:Q ST/FAU 5026 over W BR PAPILLION CREEK
Structure number:U182502820
Location:OMAHA Q @ 136TH
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:88.9 ft. [27.1 m]
Total length:227.0 ft. [69.2 m]
Roadway width between curbs:49.9 ft. [15.2 m]
Deck width edge-to-edge:63.7 ft. [19.4 m]
Skew angle:45°
Owner:City or Municipal Highway Agency [04]
Year built:1980
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:29,050 [as of 2006]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:70.3 tons [63.9 metric tons]
Inventory rating:41.6 tons [37.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:24,400 [as of 1998]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:There are no noticeable or noteworthy deficiencies which affect the condition of the channel. [9]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:25.7 tons [23.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:66.0

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,200 [as of 1990]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:61.4 tons [55.8 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:78.8