OLD MPL RD/FAU5154 over BIG PAPILLION CREEK
Map
Coordinates:
+41.29249, -96.0981341°17'33" N, 96°05'53" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | OLD MPL RD/FAU5154 over BIG PAPILLION CREEK |
| Structure number: | U1825K1435 |
| Location: | 118TH & MAPLE ST |
| Purpose: | Carries highway over waterway |
| Route classification: | Collector (Urban) [17] |
| Length of largest span: | 55.1 ft. [16.8 m] |
| Total length: | 149.0 ft. [45.4 m] |
| Roadway width between curbs: | 27.9 ft. [8.5 m] |
| Deck width edge-to-edge: | 41.3 ft. [12.6 m] |
| Skew angle: | 10° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1994 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Prestressed concrete [5] |
| Main spans design: | Tee beam [04] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,000 [as of 2006] |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 74.2 tons [67.5 metric tons] |
| Inventory rating: | 41.6 tons [37.8 metric tons] |
| Sufficiency rating: | 82.7 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 2,000 [as of 1998] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 91.3 |