BOG ROAD over CONNECTICUT RIVER
Map
Coordinates:
+44.65182, -71.5625544°39'07" N, 71°33'45" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | BOG ROAD over CONNECTICUT RIVER |
| Structure number: | 024400980006400 |
| Location: | 0.02 MILE EAST OF VT. S L |
| Purpose: | Carries highway over waterway |
| Route classification: | Local (Rural) [09] |
| Length of largest span: | 150.6 ft. [45.9 m] |
| Total length: | 194.9 ft. [59.4 m] |
| Roadway width between curbs: | 14.1 ft. [4.3 m] |
| Deck width edge-to-edge: | 15.4 ft. [4.7 m] |
| Vertical clearance above deck: | 19.7 ft. [6.0 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1893 |
| Year reconstructed: | 2005 |
| Historic significance: | Bridge is eligible for the National Register of Historic Places [2] |
| Design load: | MS 18 / HS 20 [5] |
| Main span material: | Steel [3] |
| Main span design: | Truss - Thru [10] |
| Deck type: | Wood or Timber [8] |
| Wearing surface: | Wood or Timber [7] |
2010 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 260 [as of 2006] |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 43.1 tons [39.2 metric tons] |
| Inventory rating: | 25.2 tons [22.9 metric tons] |
| Sufficiency rating: | 57.5 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $2,500,000 |
2000 Inspection
| Status: | Bridge closed to all traffic [K] |
| Deck condition: | Imminent Failure [1 out of 9] |
| Superstructure condition: | Imminent Failure [1 out of 9] |
| Substructure condition: | Imminent Failure [1 out of 9] |
| Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Evaluation: | Not applicable [N] |