Facts 

Name:JOPPA ROAD WEST over WARNER RIVER
Structure number:026301910012200
Location:.08 MI FROM NH RTE 103
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:71.9 ft. [21.9 m]
Total length:76.1 ft. [23.2 m]
Roadway width between curbs:12.8 ft. [3.9 m]
Deck width edge-to-edge:14.1 ft. [4.3 m]
Vertical clearance above deck:10.8 ft. [3.3 m]
Owner:City or Municipal Highway Agency [04]
Year built:1853
Year reconstructed:1963
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Main span material:Wood or timber [7]
Main span design:Truss - Thru [10]
Deck type:Wood or Timber [8]
Wearing surface:Wood or Timber [7]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:160 [as of 2007]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:5.9 tons [5.4 metric tons]
Inventory rating:4.0 tons [3.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:12.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,500,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:120 [as of 1994]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:5.9 tons [5.4 metric tons]
Inventory rating:4.0 tons [3.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:13.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:100 [as of 1984]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:7.5 tons [6.8 metric tons]
Inventory rating:5.0 tons [4.5 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:17.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$544,000