Share:

ENGLEWOOD AVE over OVERPECK CREEK

Map 

Coordinates:
+40.88667, -73.96667
40°53'12" N, 73°58'00" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:ENGLEWOOD AVE over OVERPECK CREEK
Structure number:020015C
Location:0.35 MI W. OF CR 501
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:22.0 ft. [6.7 m]
Total length:23.0 ft. [7.0 m]
Roadway width between curbs:34.1 ft. [10.4 m]
Deck width edge-to-edge:49.2 ft. [15.0 m]
Skew angle:10°
Owner:County Highway Agency [02]
Year built:1909
Year reconstructed:2001
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 22.5 / HS 25 [9]
Main span material:Prestressed concrete [5]
Main span design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,450 [as of 2008]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Countermeasures have been installed to mitigate an existing problem with scour. [7]
Operating rating:49.0 tons [44.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:93.8

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:11,047 [as of 1996]
Truck traffic:3% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:33.7 tons [30.6 metric tons]
Inventory rating:19.8 tons [18.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:47.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$407,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:11,300 [as of 1989]
Truck traffic:3% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection has failed. River control devices have been destroyed. Stream bed aggradation, degradation or lateral movement has changed the channel to now threaten the bridge and/or approach roadway. [3]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:14.9 tons [13.5 metric tons]
Inventory rating:5.9 tons [5.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:27.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$415,000