RAMAPO VALLEY ROAD over MAHWAH CREEK

Map 

Coordinates:
+41.10333, -74.15083
41°06'12" N, 74°09'03" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:RAMAPO VALLEY ROAD over MAHWAH CREEK
Structure number:020033C
Location:0.7 MI N OF RT 17
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:44.0 ft. [13.4 m]
Total length:45.9 ft. [14.0 m]
Roadway width between curbs:39.7 ft. [12.1 m]
Deck width edge-to-edge:49.9 ft. [15.2 m]
Owner:County Highway Agency [02]
Year built:1920
Year reconstructed:1931
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Concrete [1]
Main span design:Frame [07]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,842 [as of 2008]
Truck traffic:4% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:61.8 tons [56.2 metric tons]
Inventory rating:37.0 tons [33.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:62.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,155,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,571 [as of 1996]
Truck traffic:4% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:61.4 tons [55.8 metric tons]
Inventory rating:36.6 tons [33.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:66.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$2,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:11,048 [as of 1991]
Truck traffic:4% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:29.7 tons [27.0 metric tons]
Inventory rating:9.9 tons [9.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:34.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$629,000