CLAY STREET over PASSAIC RIVER

Map 

Coordinates:
+40.75083, -74.16556
40°45'03" N, 74°09'56" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CLAY STREET over PASSAIC RIVER
Structure number:0700H01
Location:0.25 MI N OF I-280
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:118.1 ft. [36.0 m]
Total length:328.1 ft. [100.0 m]
Roadway width between curbs:36.7 ft. [11.2 m]
Deck width edge-to-edge:39.4 ft. [12.0 m]
Vertical clearance above deck:16.7 ft. [5.1 m]
Vertical clearance below bridge:6.9 ft. [2.1 m]
Owner:County Highway Agency [02]
Year built:1908
Year reconstructed:1976
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Movable - Swing [17]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,240 [as of 2008]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Pier/abutment protection:In place but in a deteriorated condition [3]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:33.9 tons [30.8 metric tons]
Inventory rating:19.9 tons [18.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:31.6
Estimated cost of work:$47,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:20,400 [as of 2000]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:33.7 tons [30.6 metric tons]
Inventory rating:19.8 tons [18.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:32.2
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$83,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:17,000 [as of 1990]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Pier/abutment protection:In place but in a deteriorated condition [3]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:31.7 tons [28.8 metric tons]
Inventory rating:15.8 tons [14.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:35.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$986,000