BRIDGE STREET over PASSAIC RIVER
Map
Coordinates:
+40.74500, -74.1663940°44'42" N, 74°09'59" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | BRIDGE STREET over PASSAIC RIVER |
| Structure number: | 0700H03 |
| Location: | 0.2 MI S OF I-280 |
| Purpose: | Carries highway and pedestrian walkway over waterway |
| Route classification: | Minor Arterial (Urban) [16] |
| Length of largest span: | 122.1 ft. [37.2 m] |
| Total length: | 371.4 ft. [113.2 m] |
| Roadway width between curbs: | 39.0 ft. [11.9 m] |
| Deck width edge-to-edge: | 40.4 ft. [12.3 m] |
| Vertical clearance above deck: | 17.4 ft. [5.3 m] |
| Vertical clearance below bridge: | 6.9 ft. [2.1 m] |
| Owner: | County Highway Agency [02] |
| Year built: | 1913 |
| Year reconstructed: | 1981 |
| Historic significance: | Bridge is eligible for the National Register of Historic Places [2] |
| Number of main spans: | 2 |
| Main spans material: | Steel [3] |
| Main spans design: | Movable - Swing [17] |
| Deck type: | Open Grating [3] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 11,580 [as of 2008] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Pier/abutment protection: | In place and functioning [2] |
| Scour condition: | Countermeasures have been installed to mitigate an existing problem with scour. [7] |
| Operating rating: | 37.0 tons [33.6 metric tons] |
| Inventory rating: | 22.0 tons [20.0 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 48.6 |
| Estimated cost of work: | $46,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 16,230 [as of 2000] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Pier/abutment protection: | In place and functioning [2] |
| Scour condition: | Countermeasures have been installed to mitigate an existing problem with scour. [7] |
| Operating rating: | 36.6 tons [33.3 metric tons] |
| Inventory rating: | 21.8 tons [19.8 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 49.4 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $45,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 13,200 [as of 1990] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Pier/abutment protection: | In place but in a deteriorated condition [3] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 24.8 tons [22.5 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 54.0 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $756,000 |