Share:

ORATON PARKWAY NB over I-280

Map 

Coordinates:
+40.75917, -74.20806
40°45'33" N, 74°12'29" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:ORATON PARKWAY NB over I-280
Structure number:0730171
Location:AT 280-GSP JCT
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Local (Urban) [19]
Length of largest span:112.9 ft. [34.4 m]
Total length:293.0 ft. [89.3 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:42.7 ft. [13.0 m]
Vertical clearance above deck:21.3 ft. [6.5 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1966
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,416 [as of 2009]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:64.9 tons [59.0 metric tons]
Inventory rating:38.9 tons [35.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:73.9
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$768,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:70,000 [as of 1998]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:64.4 tons [58.5 metric tons]
Inventory rating:38.6 tons [35.1 metric tons]
Sufficiency rating:89.3
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$684,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,240 [as of 1991]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:75.2 tons [68.4 metric tons]
Inventory rating:29.7 tons [27.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:87.4
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$618,000