Share:

WASHINGTON ST over AMBOY SECONDARY

Map 

Coordinates:
+40.47583, -74.29556
40°28'33" N, 74°17'44" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:WASHINGTON ST over AMBOY SECONDARY
Structure number:1255162
Location:0.3 mi West of US9
Purpose:Carries highway and pedestrian walkway over railroad
Route classification:Minor Arterial (Urban) [16]
Length of largest span:59.1 ft. [18.0 m]
Total length:125.0 ft. [38.1 m]
Roadway width between curbs:30.2 ft. [9.2 m]
Deck width edge-to-edge:38.1 ft. [11.6 m]
Vertical clearance below bridge:20.3 ft. [6.2 m]
Skew angle:14°
Owner:Unknown [80]
Year built:1955
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,325 [as of 2008]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:40.9 tons [37.2 metric tons]
Inventory rating:24.0 tons [21.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:50.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$4,220,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,700 [as of 1996]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:40.6 tons [36.9 metric tons]
Inventory rating:23.8 tons [21.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:49.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$4,213,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,200 [as of 1990]
Truck traffic:3% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:42.6 tons [38.7 metric tons]
Inventory rating:21.8 tons [19.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:47.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,280,000