WEST BROOK ROAD over WANAQUE RESERVOIR

Map 

Coordinates:
+41.07194, -74.28833
41°04'19" N, 74°17'18" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:WEST BROOK ROAD over WANAQUE RESERVOIR
Structure number:1600491
Location:1300 FT.W.OF RINGWOOD AVE
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:73.2 ft. [22.3 m]
Total length:504.9 ft. [153.9 m]
Roadway width between curbs:20.0 ft. [6.1 m]
Deck width edge-to-edge:22.6 ft. [6.9 m]
Owner:County Highway Agency [02]
Year built:1926
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Number of main spans:7
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:6,130 [as of 2009]
Truck traffic:4% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:80.9 tons [73.5 metric tons]
Inventory rating:49.0 tons [44.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:65.8
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$3,748,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:5,550 [as of 1999]
Truck traffic:4% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Countermeasures have been installed to mitigate an existing problem with scour. [7]
Operating rating:80.2 tons [72.9 metric tons]
Inventory rating:48.5 tons [44.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:67.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$9,039,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:4,950 [as of 1990]
Truck traffic:3% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:50.5 tons [45.9 metric tons]
Inventory rating:15.8 tons [14.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:9.2
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$5,610,000