Share:

NJTP over GRND AV,FLT RCK BK,NRR

Map 

Coordinates:
+40.87500, -73.98833
40°52'30" N, 73°59'18" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:NJTP over GRND AV,FLT RCK BK,NRR
Structure number:M120460
Location:1.5 MI N OF I-95 & I-80
Purpose:Carries highway over highway, waterway, and railroad
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:119.1 ft. [36.3 m]
Total length:1525.0 ft. [464.8 m]
Roadway width between curbs:153.9 ft. [46.9 m]
Deck width edge-to-edge:169.0 ft. [51.5 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Skew angle:99°
Owner:State Toll Authority [31]
Year built:1961
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:19
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:170,297 [as of 2009]
Truck traffic:12% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:94.8 tons [86.2 metric tons]
Inventory rating:56.9 tons [51.7 metric tons]
Sufficiency rating:68.0

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:200,000 [as of 1995]
Truck traffic:12% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:94.1 tons [85.5 metric tons]
Inventory rating:56.4 tons [51.3 metric tons]
Sufficiency rating:79.0
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$3,400,000