NJTP over GRND AV,FLT RCK BK,NRR
Map
Coordinates:
+40.87500, -73.9883340°52'30" N, 73°59'18" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | NJTP over GRND AV,FLT RCK BK,NRR |
| Structure number: | M120460 |
| Location: | 1.5 MI N OF I-95 & I-80 |
| Purpose: | Carries highway over highway, waterway, and railroad |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 119.1 ft. [36.3 m] |
| Total length: | 1525.0 ft. [464.8 m] |
| Roadway width between curbs: | 153.9 ft. [46.9 m] |
| Deck width edge-to-edge: | 169.0 ft. [51.5 m] |
| Vertical clearance below bridge: | 14.8 ft. [4.5 m] |
| Skew angle: | 99° |
| Owner: | State Toll Authority [31] |
| Year built: | 1961 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 19 |
| Main spans material: | Steel [3] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 170,297 [as of 2009] |
| Truck traffic: | 12% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 94.8 tons [86.2 metric tons] |
| Inventory rating: | 56.9 tons [51.7 metric tons] |
| Sufficiency rating: | 68.0 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 200,000 [as of 1995] |
| Truck traffic: | 12% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 94.1 tons [85.5 metric tons] |
| Inventory rating: | 56.4 tons [51.3 metric tons] |
| Sufficiency rating: | 79.0 |
| Recommended work: | Bridge deck rehabilitation with only incidental widening. [36] |
| Estimated cost of work: | $3,400,000 |