Share:

NM-213 over UNNAMED WATERWAY

Map 

Coordinates:
+32.06174, -106.47741
32°03'42" N, 106°28'39" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:NM-213 over UNNAMED WATERWAY
Structure number:000000000005780
Location:4.7 MI N TEXAS/NEW MEXICO
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:4.9 ft. [1.5 m]
Total length:33.5 ft. [10.2 m]
Owner:State Highway Agency [01]
Year built:1941
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:6
Main spans material:Concrete continuous [2]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:4,735 [as of 2008]
Truck traffic:7% of total traffic
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:102.4 tons [93.1 metric tons]
Inventory rating:27.0 tons [24.5 metric tons]
Sufficiency rating:85.0

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,607 [as of 1998]
Truck traffic:6% of total traffic
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:98.0 tons [89.1 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Sufficiency rating:83.3

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,179 [as of 1991]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Culvert condition:Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Inventory rating:26.7 tons [24.3 metric tons]
Sufficiency rating:87.3