ACCESS ROAD over SOUTH CANADIAN RIVER
Map
Coordinates:
+35.40000, -104.1833335°23'60" N, 104°10'60" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | ACCESS ROAD over SOUTH CANADIAN RIVER |
| Structure number: | CEPSWANM-000001 |
| Location: | 32 MI NW OF TUCUMCARI, NM |
| Purpose: | Carries highway over waterway |
| Route classification: | Local (Rural) [09] |
| Length of largest span: | 69.9 ft. [21.3 m] |
| Total length: | 350.1 ft. [106.7 m] |
| Roadway width between curbs: | 18.0 ft. [5.5 m] |
| Deck width edge-to-edge: | 25.3 ft. [7.7 m] |
| Owner: | Corps of Engineers (Civil) [70] |
| Year built: | 1940 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Number of main spans: | 5 |
| Main spans material: | Concrete [1] |
| Main spans design: | Arch - Deck [11] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Epoxy Overlay [5] |
2010 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 150 [as of 2009] |
| Truck traffic: | 20% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 16.7 tons [15.2 metric tons] |
| Inventory rating: | 12.9 tons [11.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 33.6 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $1,068,000 |
2000 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 150 [as of 1997] |
| Truck traffic: | 20% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 36.0 tons [32.7 metric tons] |
| Inventory rating: | 21.6 tons [19.6 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 49.9 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $6,870,000 |