I 215 over DRY WASH
Map
Coordinates:
+36.06806, -115.1947236°04'05" N, 115°11'41" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I 215 over DRY WASH |
| Structure number: | B1993 |
| Location: | 0.1km W of VLY VIEW RD |
| Purpose: | Carries highway and pedestrian walkway over waterway |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Length of largest span: | 12.1 ft. [3.7 m] |
| Total length: | 26.6 ft. [8.1 m] |
| Owner: | County Highway Agency [02] |
| Year built: | 1998 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Number of main spans: | 2 |
| Main spans material: | Concrete [1] |
| Main spans design: | Culvert [19] |
| Deck type: | Not applicable [N] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 124,000 [as of 2008] |
| Truck traffic: | 5% of total traffic |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Culvert condition: | Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 77.9 tons [70.8 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Sufficiency rating: | 85.0 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 14,000 [as of 1999] |
| Truck traffic: | 5% of total traffic |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Culvert condition: | No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. [8] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 77.9 tons [70.8 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Sufficiency rating: | 83.0 |