Share:

INDUSTRIAL RD over CHANNEL

Map 

Coordinates:
+36.09889, -115.18194
36°05'56" N, 115°10'55" W
Source: National Bridge Inventory (2010 edition)
Information not verified. Use at your own risk.

Facts 

Name:INDUSTRIAL RD over CHANNEL
Structure number:B2680
Location:LAS VEGAS
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:10.8 ft. [3.3 m]
Total length:26.6 ft. [8.1 m]
Skew angle:39°
Owner:County Highway Agency [02]
Year built:2001
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,200 [as of 2008]
Truck traffic:1% of total traffic
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Culvert condition:Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:36.0 tons [32.7 metric tons]
Inventory rating:17.9 tons [16.3 metric tons]
Sufficiency rating:58.8