Share:

SR 549/ERRECART BL over HUMBOLDT RIVER & UPRR

Map 

Coordinates:
+40.82500, -115.76833
40°49'30" N, 115°46'06" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SR 549/ERRECART BL over HUMBOLDT RIVER & UPRR
Structure number:G1902
Location:ELKO
Purpose:Carries highway and pedestrian walkway over railroad and waterway
Route classification:Collector (Urban) [17]
Length of largest span:170.0 ft. [51.8 m]
Total length:440.0 ft. [134.1 m]
Roadway width between curbs:51.8 ft. [15.8 m]
Deck width edge-to-edge:61.0 ft. [18.6 m]
Vertical clearance below bridge:22.0 ft. [6.7 m]
Skew angle:20°
Owner:City or Municipal Highway Agency [04]
Year built:1990
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,900 [as of 2008]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:64.4 tons [58.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:86.1

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,750 [as of 1997]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:64.4 tons [58.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:84.5