Share:

RMP SPR MTN WB-15N over UPRR & HIGHLAND DR

Map 

Coordinates:
+36.12694, -115.17917
36°07'37" N, 115°10'45" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:RMP SPR MTN WB-15N over UPRR & HIGHLAND DR
Structure number:G2014R
Location:LAS VEGAS
Purpose:Carries highway and pedestrian walkway over highway and railroad
Route classification:Minor Arterial (Urban) [16]
Length of largest span:161.8 ft. [49.3 m]
Total length:776.0 ft. [236.5 m]
Roadway width between curbs:41.0 ft. [12.5 m]
Deck width edge-to-edge:49.9 ft. [15.2 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1999
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:5
Main spans material:Prestressed concrete continuous [6]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,500 [as of 2008]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:77.9 tons [70.8 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:96.8

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,000 [as of 1999]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:77.9 tons [70.8 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:99.8