US 95 over TWAIN AVENUE

Map 

Coordinates:
+36.12194, -115.08361
36°07'19" N, 115°05'01" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:US 95 over TWAIN AVENUE
Structure number:H1451
Location:LAS VEGAS
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:151.9 ft. [46.3 m]
Total length:153.9 ft. [46.9 m]
Roadway width between curbs:140.1 ft. [42.7 m]
Deck width edge-to-edge:145.3 ft. [44.3 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Skew angle:11°
Owner:State Highway Agency [01]
Year built:1981
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Main span material:Prestressed concrete [5]
Main span design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:130,000 [as of 2008]
Truck traffic:7% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:75.8 tons [68.9 metric tons]
Sufficiency rating:80.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,066,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:114,935 [as of 1996]
Truck traffic:7% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:64.4 tons [58.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:80.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,066,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:60,000 [as of 1989]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:64.4 tons [58.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:83.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,066,000