I 515 over EASTERN AV
Map
Coordinates:
+36.16778, -115.1155636°10'04" N, 115°06'56" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I 515 over EASTERN AV |
| Structure number: | I1440 |
| Location: | LAS VEGAS |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 178.2 ft. [54.3 m] |
| Total length: | 182.1 ft. [55.5 m] |
| Roadway width between curbs: | 116.1 ft. [35.4 m] |
| Deck width edge-to-edge: | 121.4 ft. [37.0 m] |
| Vertical clearance below bridge: | 16.7 ft. [5.1 m] |
| Skew angle: | 3° |
| Owner: | State Highway Agency [01] |
| Year built: | 1984 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Main span material: | Steel [3] |
| Main span design: | Box beam or girders - Multiple [05] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 127,300 [as of 2008] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 104.5 tons [95.0 metric tons] |
| Inventory rating: | 62.5 tons [56.8 metric tons] |
| Sufficiency rating: | 87.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $2,996,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 112,925 [as of 1996] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 77.9 tons [70.8 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 71.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $2,996,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 76,990 [as of 1989] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 77.2 tons [70.2 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 98.0 |