Share:

I 515 over US 93

Map 

Coordinates:
+36.13556, -115.09028
36°08'08" N, 115°05'25" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I 515 over US 93
Structure number:I1449
Location:LAS VEGAS
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:186.0 ft. [56.7 m]
Total length:381.9 ft. [116.4 m]
Roadway width between curbs:115.5 ft. [35.2 m]
Deck width edge-to-edge:121.4 ft. [37.0 m]
Vertical clearance above deck:27.6 ft. [8.4 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Skew angle:55°
Owner:State Highway Agency [01]
Year built:1986
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:2
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:110,600 [as of 2008]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:72.2 tons [65.6 metric tons]
Sufficiency rating:98.0

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:94,815 [as of 1996]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:64.4 tons [58.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:98.0

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:61,955 [as of 1989]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:64.4 tons [58.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:98.0