Share:

RMP 95S to RAINBOW over SUMMERLIN PW & RAINB RMP

Map 

Coordinates:
+36.17750, -115.24667
36°10'39" N, 115°14'48" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:RMP 95S to RAINBOW over SUMMERLIN PW & RAINB RMP
Structure number:I1843E
Location:LAS VEGAS
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:127.6 ft. [38.9 m]
Total length:311.0 ft. [94.8 m]
Roadway width between curbs:57.1 ft. [17.4 m]
Deck width edge-to-edge:60.0 ft. [18.3 m]
Vertical clearance above deck:18.0 ft. [5.5 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:2006
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Prestressed concrete continuous [6]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,000 [as of 2008]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:81.5 tons [74.1 metric tons]
Sufficiency rating:99.3

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,100 [as of 1996]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:64.9 tons [59.0 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:99.2

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,065 [as of 1989]
Truck traffic:3% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:64.4 tons [58.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:99.5