RMP I215E TO LV BL over RMP I 15N TO I 215E

Map 

Coordinates:
+36.06139, -115.17806
36°03'41" N, 115°10'41" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:RMP I215E TO LV BL over RMP I 15N TO I 215E
Structure number:I2006
Location:LAS VEGAS
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:121.1 ft. [36.9 m]
Total length:320.9 ft. [97.8 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:43.0 ft. [13.1 m]
Vertical clearance below bridge:16.7 ft. [5.1 m]
Owner:County Highway Agency [02]
Year built:1994
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Prestressed concrete continuous [6]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,700 [as of 2008]
Truck traffic:8% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:70.1 tons [63.7 metric tons]
Inventory rating:42.0 tons [38.2 metric tons]
Sufficiency rating:99.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,727,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:500 [as of 1996]
Truck traffic:8% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:77.2 tons [70.2 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:100.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,727,000