Facts 

Name:RTE 28 over HUDSON RIVER
Structure number:000000001020370
Location:JCT RTE 28& HUDSON RIVER
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Rural) [06]
Length of largest span:179.8 ft. [54.8 m]
Total length:369.8 ft. [112.7 m]
Roadway width between curbs:32.8 ft. [10.0 m]
Deck width edge-to-edge:34.8 ft. [10.6 m]
Skew angle:45°
Owner:State Highway Agency [01]
Year built:1959
Year reconstructed:1997
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 18 / H 20 [4]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

Latest Available Inspection: May 2015 

Status:Posted for other load-capacity restriction [R]
Average daily traffic:3,442 [as of 2010]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Operating rating:52.9 tons [48.1 metric tons]
Inventory rating:28.9 tons [26.3 metric tons]
Sufficiency rating:71.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$6,185,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
May 201571.6Not deficientFairFairFair3442
July 201441.8Structurally deficientFairFairFair3442
August 201342.2Structurally deficientFairFairFair3164
August 201241.8Structurally deficientFairFairFair3450
July 201141.8Functionally obsoleteFairFairFair3450
July 201041.6Functionally obsoleteFairFairFair3576
August 200841.4Functionally obsoleteSatisfactoryFairFair4634
July 200641.4Functionally obsoleteSatisfactoryFairFair4577
August 200443.1Functionally obsoleteSatisfactoryFairFair3367
August 200242.8Functionally obsoleteSatisfactoryFairFair3367
August 200040.8Functionally obsoleteGoodFairFair3367
August 199840.8Functionally obsoleteGoodFairFair3367
October 19966.0Structurally deficientPoorPoorPoor2711
July 19945.0Structurally deficientPoorPoorPoor2711
November 19925.0Structurally deficientPoorPoorFair2837
May 19907.0Structurally deficientFairSeriousFair2754