RTE 36 over GENESEE RIVER

Map 

Coordinates:
+42.73848, -77.88159
42°44'19" N, 77°52'54" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:RTE 36 over GENESEE RIVER
Structure number:000000001023670
Location:JCT RTE 36 + GENESEE R
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Rural) [06]
Length of largest span:129.9 ft. [39.6 m]
Total length:343.8 ft. [104.8 m]
Roadway width between curbs:35.8 ft. [10.9 m]
Deck width edge-to-edge:47.9 ft. [14.6 m]
Owner:State Highway Agency [01]
Year built:1957
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,284 [as of 2007]
Truck traffic:8% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:44.9 tons [40.8 metric tons]
Inventory rating:25.0 tons [22.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:40.7
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$6,009,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,804 [as of 1998]
Truck traffic:7% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:70.8 tons [64.4 metric tons]
Inventory rating:39.8 tons [36.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:50.3
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$2,724,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,500 [as of 1990]
Truck traffic:7% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:There are no noticeable or noteworthy deficiencies which affect the condition of the channel. [9]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:64.4 tons [58.5 metric tons]
Inventory rating:33.7 tons [30.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:48.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$929,000