Facts 

Name:RTE 63 over GENESEE RIVER
Structure number:000000001028700
Location:JCT RTE 63 + GENESEE R
Purpose:Carries highway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:159.8 ft. [48.7 m]
Total length:283.8 ft. [86.5 m]
Roadway width between curbs:30.8 ft. [9.4 m]
Deck width edge-to-edge:34.1 ft. [10.4 m]
Vertical clearance above deck:15.1 ft. [4.6 m]
Owner:State Highway Agency [01]
Year built:1950
Year reconstructed:1976
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,304 [as of 2009]
Truck traffic:6% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:24.0 tons [21.8 metric tons]
Sufficiency rating:49.6
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$3,534,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,909 [as of 1998]
Truck traffic:14% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:53.8 tons [48.9 metric tons]
Inventory rating:32.9 tons [29.9 metric tons]
Sufficiency rating:62.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,915,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,650 [as of 1990]
Truck traffic:14% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:50.5 tons [45.9 metric tons]
Inventory rating:30.7 tons [27.9 metric tons]
Sufficiency rating:54.4
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$225,000