Facts 

Name:RTE 244 over GENESEE RIVER
Structure number:000000001042860
Location:JCT RTE 244 & GENESEE RIV
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:127.0 ft. [38.7 m]
Total length:259.9 ft. [79.2 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:39.7 ft. [12.1 m]
Owner:State Highway Agency [01]
Year built:1997
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:2
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,233 [as of 2009]
Truck traffic:9% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:85.8 tons [78.0 metric tons]
Inventory rating:44.9 tons [40.8 metric tons]
Sufficiency rating:70.5
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$525,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,393 [as of 1998]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:85.8 tons [78.0 metric tons]
Inventory rating:44.9 tons [40.8 metric tons]
Sufficiency rating:81.2
Recommended work:Replacement of bridge or other structure because of relocation of road. [32]
Estimated cost of work:$5,061,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,805 [as of 1990]
Truck traffic:7% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:50.5 tons [45.9 metric tons]
Inventory rating:30.7 tons [27.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:46.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$341,000