RTE 251 over GENESEE RIVER

Map 

Coordinates:
+43.00481, -77.73002
43°00'17" N, 77°43'48" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:RTE 251 over GENESEE RIVER
Structure number:000000001043390
Location:3.2 MI W JCT RTS 251 & 15
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Rural) [06]
Length of largest span:129.9 ft. [39.6 m]
Total length:271.0 ft. [82.6 m]
Roadway width between curbs:35.8 ft. [10.9 m]
Deck width edge-to-edge:37.7 ft. [11.5 m]
Skew angle:25°
Owner:State Highway Agency [01]
Year built:1995
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,304 [as of 2009]
Truck traffic:8% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Excellent [9 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:98.8 tons [89.8 metric tons]
Inventory rating:70.8 tons [64.4 metric tons]
Sufficiency rating:97.4
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$998,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,081 [as of 1998]
Truck traffic:7% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:98.8 tons [89.8 metric tons]
Inventory rating:70.8 tons [64.4 metric tons]
Sufficiency rating:98.4
Recommended work:Replacement of bridge or other structure because of relocation of road. [32]
Estimated cost of work:$3,465,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:2,896 [as of 1990]
Truck traffic:7% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:12.9 tons [11.7 metric tons]
Inventory rating:11.9 tons [10.8 metric tons]
Evaluation:Structurally deficient [1]
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,854,000