RTE 251 over GENESEE RIVER

Map 

Coordinates:
+43.00481, -77.73002
43°00'17" N, 77°43'48" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:RTE 251 over GENESEE RIVER
Structure number:000000001043390
Location:3.2 MI W JCT RTS 251 & 15
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Rural) [06]
Length of largest span:129.9 ft. [39.6 m]
Total length:271.0 ft. [82.6 m]
Roadway width between curbs:35.8 ft. [10.9 m]
Deck width edge-to-edge:37.7 ft. [11.5 m]
Skew angle:25°
Owner:State Highway Agency [01]
Year built:1995
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

Latest Available Inspection: June 2011 

Status:Open, no restriction [A]
Average daily traffic:3,300 [as of 2009]
Truck traffic:8% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Excellent [9 out of 9]
Structural appraisal:Superior to present desirable criteria [9]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:98.8 tons [89.8 metric tons]
Inventory rating:70.8 tons [64.4 metric tons]
Sufficiency rating:97.4
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$4,327,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
June 201197.4Not deficientVery GoodExcellentExcellent3300
June 200997.4Not deficientVery GoodExcellentExcellent3304
June 200798.5Not deficientVery GoodExcellentExcellent2649
October 200596.9Not deficientVery GoodExcellentExcellent5691
October 200398.3Not deficientVery GoodExcellentExcellent3465
July 200198.4Not deficientVery GoodExcellentExcellent3081
July 199998.4Not deficientVery GoodVery GoodVery Good3081
July 199798.5Not deficientVery GoodVery GoodVery Good2561
July 199598.4Not deficientVery GoodVery GoodVery Good2561
March 19950.0Structurally deficientSerious-Fair2977
September 19930.0Structurally deficientSeriousSeriousFair2977
November 19920.0Structurally deficientSeriousSeriousFair2977
June 19910.0Structurally deficientSeriousSeriousFair2896