RTE 253 over GENESEE RIVER

Map 

Coordinates:
+43.02963, -77.72325
43°01'47" N, 77°43'24" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:RTE 253 over GENESEE RIVER
Structure number:000000001043440
Location:RT 253 OVER GENESEE RIVER
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:119.8 ft. [36.5 m]
Total length:253.9 ft. [77.4 m]
Roadway width between curbs:47.9 ft. [14.6 m]
Deck width edge-to-edge:59.7 ft. [18.2 m]
Skew angle:10°
Owner:State Highway Agency [01]
Year built:1976
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,699 [as of 2009]
Truck traffic:5% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:70.8 tons [64.4 metric tons]
Inventory rating:41.9 tons [38.1 metric tons]
Sufficiency rating:95.8
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$998,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,160 [as of 1998]
Truck traffic:5% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:66.8 tons [60.7 metric tons]
Inventory rating:37.8 tons [34.4 metric tons]
Sufficiency rating:98.1
Recommended work:Replacement of bridge or other structure because of relocation of road. [32]
Estimated cost of work:$4,635,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,254 [as of 1990]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:66.3 tons [60.3 metric tons]
Inventory rating:37.6 tons [34.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:67.0
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$1,866,000