RTE I495 over RTE I295, RTE I295, RTE

Map 

Coordinates:
+40.74556, -73.77209
40°44'44" N, 73°46'20" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:RTE I495 over RTE I295, RTE I295, RTE
Structure number:000000001055290
Location:JCT I495+I78
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:77.8 ft. [23.7 m]
Total length:210.0 ft. [64.0 m]
Roadway width between curbs:34.8 ft. [10.6 m]
Deck width edge-to-edge:51.2 ft. [15.6 m]
Vertical clearance below bridge:15.4 ft. [4.7 m]
Skew angle:31°
Owner:State Highway Agency [01]
Year built:1960
Year reconstructed:2003
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:76,120 [as of 1989]
Truck traffic:13% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:62.9 tons [57.2 metric tons]
Inventory rating:37.0 tons [33.6 metric tons]
Sufficiency rating:90.3
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$3,445,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:76,120 [as of 1989]
Truck traffic:9% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:65.8 tons [59.8 metric tons]
Inventory rating:32.9 tons [29.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:58.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$2,905,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:76,120 [as of 1989]
Truck traffic:9% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Serious [3 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:65.3 tons [59.4 metric tons]
Inventory rating:33.7 tons [30.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:28.2
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$504,000