Facts
| Name: | RTE I678 over H.HARDING EXP W, FLUSHIN |
| Structure number: | 00000000105578C |
| Location: | JCT I495 & I678 |
| Purpose: | Carries highway overpass (third level) over highway and waterway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 89.9 ft. [27.4 m] |
| Total length: | 1287.1 ft. [392.3 m] |
| Roadway width between curbs: | 21.0 ft. [6.4 m] |
| Deck width edge-to-edge: | 23.0 ft. [7.0 m] |
| Vertical clearance below bridge: | 15.1 ft. [4.6 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1963 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 29 |
| Main spans material: | Steel [3] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Integral Concrete (separate non-modified layer of concrete added to structural deck) [2] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 12,066 [as of 2003] |
| Truck traffic: | 13% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 51.9 tons [47.2 metric tons] |
| Inventory rating: | 30.9 tons [28.1 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 88.5 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $15,058,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 112,239 [as of 1989] |
| Truck traffic: | 9% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge over "tidal" waters that has not been evaluated for scour, but considered low risk. [T] |
| Operating rating: | 47.9 tons [43.5 metric tons] |
| Inventory rating: | 22.9 tons [20.8 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 72.4 |
| Recommended work: | Replacement of bridge or other structure because of relocation of road. [32] |
| Estimated cost of work: | $17,482,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 112,239 [as of 1989] |
| Truck traffic: | 9% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 47.5 tons [43.2 metric tons] |
| Inventory rating: | 22.8 tons [20.7 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 40.0 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $1,875,000 |