MORRIS AVENUE over RTE I95

Map 

Coordinates:
+40.84498, -73.90937
40°50'42" N, 73°54'34" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:MORRIS AVENUE over RTE I95
Structure number:000000001066290
Location:.9 MI E I87+I95
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:88.9 ft. [27.1 m]
Total length:101.7 ft. [31.0 m]
Roadway width between curbs:59.7 ft. [18.2 m]
Deck width edge-to-edge:82.0 ft. [25.0 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Owner:State Highway Agency [01]
Year built:1960
Year reconstructed:1975
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Frame [07]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,913 [as of 1999]
Truck traffic:13% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:55.9 tons [50.8 metric tons]
Inventory rating:31.9 tons [29.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:88.6
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$4,059,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,913 [as of 1999]
Truck traffic:4% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:98.8 tons [89.8 metric tons]
Inventory rating:35.9 tons [32.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:90.7
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$1,182,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:4,000 [as of 1974]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:79.6
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$459,000