GRAND CONCOURSE over RTE I87, RTE I87, Rmp to
Map
Coordinates:
+40.81259, -73.9314640°48'45" N, 73°55'53" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | GRAND CONCOURSE over RTE I87, RTE I87, Rmp to |
| Structure number: | 000000001066780 |
| Location: | 2.3 MI S JCT I87+I95 |
| Purpose: | Carries highway and pedestrian walkway over highway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 72.8 ft. [22.2 m] |
| Total length: | 174.9 ft. [53.3 m] |
| Roadway width between curbs: | 25.9 ft. [7.9 m] |
| Deck width edge-to-edge: | 34.5 ft. [10.5 m] |
| Vertical clearance below bridge: | 13.8 ft. [4.2 m] |
| Skew angle: | 99° |
| Owner: | State Highway Agency [01] |
| Year built: | 1938 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Steel [3] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 14,638 [as of 1996] |
| Truck traffic: | 9% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 64.9 tons [59.0 metric tons] |
| Inventory rating: | 38.9 tons [35.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 58.8 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $3,497,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 14,638 [as of 1996] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 56.9 tons [51.7 metric tons] |
| Inventory rating: | 28.9 tons [26.3 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 53.7 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $1,628,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 8,500 [as of 1976] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 66.3 tons [60.3 metric tons] |
| Inventory rating: | 37.6 tons [34.2 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 45.3 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
| Estimated cost of work: | $342,000 |