Share:

RTE I95 over SEDGWICK AVE

Map 

Coordinates:
+40.84495, -73.92593
40°50'42" N, 73°55'33" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:RTE I95 over SEDGWICK AVE
Structure number:000000001066890
Location:JCT I87+I95
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:64.0 ft. [19.5 m]
Total length:65.0 ft. [19.8 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:34.8 ft. [10.6 m]
Vertical clearance above deck:17.1 ft. [5.2 m]
Vertical clearance below bridge:18.4 ft. [5.6 m]
Skew angle:20°
Owner:State Highway Agency [01]
Year built:1964
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,601 [as of 2003]
Truck traffic:13% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:75.8 tons [68.9 metric tons]
Inventory rating:39.9 tons [36.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:73.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$1,323,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:169,066 [as of 1989]
Truck traffic:9% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:84.8 tons [77.1 metric tons]
Inventory rating:49.8 tons [45.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:74.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$610,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:169,066 [as of 1989]
Truck traffic:9% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:64.4 tons [58.5 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:45.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$86,000