Share:

JEROME AVE RAMP over RTE I87, RTE I87

Map 

Coordinates:
+40.89682, -73.88051
40°53'49" N, 73°52'50" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:JEROME AVE RAMP over RTE I87, RTE I87
Structure number:000000001067050
Location:4.5 MI N I87+I95
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:91.9 ft. [28.0 m]
Total length:159.8 ft. [48.7 m]
Roadway width between curbs:47.9 ft. [14.6 m]
Deck width edge-to-edge:87.6 ft. [26.7 m]
Vertical clearance below bridge:14.1 ft. [4.3 m]
Skew angle:37°
Owner:State Highway Agency [01]
Year built:1956
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,314 [as of 2001]
Truck traffic:9% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:39.9 tons [36.3 metric tons]
Inventory rating:24.0 tons [21.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:59.8
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$8,146,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,669 [as of 1996]
Truck traffic:5% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:82.7 tons [75.2 metric tons]
Inventory rating:47.9 tons [43.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:61.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$3,758,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:17,900 [as of 1969]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:64.4 tons [58.5 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:47.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$636,000