Share:

RTE 907H over E TREMONT AVENUE

Map 

Coordinates:
+40.83981, -73.87288
40°50'23" N, 73°52'22" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:RTE 907H over E TREMONT AVENUE
Structure number:000000001067109
Location:.2 MILE N JCT I95 & BRP
Purpose:Carries highway over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:107.0 ft. [32.6 m]
Total length:108.9 ft. [33.2 m]
Roadway width between curbs:71.9 ft. [21.9 m]
Deck width edge-to-edge:85.6 ft. [26.1 m]
Vertical clearance below bridge:19.0 ft. [5.8 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1951
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 18 / H 20 [4]
Main span material:Steel [3]
Main span design:Girder and floorbeam system [03]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:125,879 [as of 2002]
Truck traffic:9% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:51.9 tons [47.2 metric tons]
Inventory rating:35.0 tons [31.8 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:74.4
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$5,416,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:101,264 [as of 1998]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:51.8 tons [47.1 metric tons]
Inventory rating:34.9 tons [31.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:75.8
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$2,522,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:40,000 [as of 1990]
Truck traffic:10% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:64.4 tons [58.5 metric tons]
Inventory rating:42.6 tons [38.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:41.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,402,000