Facts 

Name:EAST 238TH STREET over RTE 907H, BRONX RIVER, M
Structure number:000000001067150
Location:4.6 MILES N JCT I95 & BRP
Purpose:Carries highway over highway, waterway, and railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:76.8 ft. [23.4 m]
Total length:769.7 ft. [234.6 m]
Roadway width between curbs:60.0 ft. [18.3 m]
Deck width edge-to-edge:75.1 ft. [22.9 m]
Vertical clearance below bridge:37.7 ft. [11.5 m]
Owner:City or Municipal Highway Agency [04]
Year built:1930
Historic significance:Historical significance is not determinable at this time [4]
Number of main spans:10
Main spans material:Concrete continuous [2]
Main spans design:Arch - Deck [11]
Deck type:Not applicable [N]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: September 2015 

Status:Open, no restriction [A]
Average daily traffic:11,913 [as of 2011]
Truck traffic:7% of total traffic
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:68.1 tons [61.9 metric tons]
Inventory rating:23.9 tons [21.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:69.8
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$75,849,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
September 201569.8Functionally obsolete-FairSatisfactory11913
October 201369.8Functionally obsolete-FairSatisfactory11913
October 201169.8Functionally obsolete-FairSatisfactory11900
December 200969.7Functionally obsolete-FairSatisfactory13343
November 200770.7Functionally obsolete-FairSatisfactory12614
July 200570.7Functionally obsolete-FairSatisfactory12650
July 200370.7Functionally obsolete-FairSatisfactory12650
November 200169.2Functionally obsolete-FairSatisfactory12650
November 199968.2Functionally obsoleteFairFairGood12650
October 199750.8Functionally obsolete-FairFair12650
September 199532.1Structurally deficient-PoorPoor12650
September 199337.0Structurally deficient-FairPoor12650
September 199139.9Structurally deficient-PoorPoor12650