Facts 

Name:RTE I278 over RICHMOND AVE
Structure number:000000001067692
Location:JCT I278+RICHMOND AVE
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:114.8 ft. [35.0 m]
Total length:119.8 ft. [36.5 m]
Roadway width between curbs:49.9 ft. [15.2 m]
Deck width edge-to-edge:55.8 ft. [17.0 m]
Vertical clearance below bridge:14.1 ft. [4.3 m]
Skew angle:26°
Owner:State Highway Agency [01]
Year built:1962
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:56,215 [as of 2007]
Truck traffic:13% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:82.8 tons [75.3 metric tons]
Inventory rating:49.9 tons [45.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:73.5
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$4,559,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:67,635 [as of 1998]
Truck traffic:9% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:79.8 tons [72.5 metric tons]
Inventory rating:37.8 tons [34.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:60.9
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,806,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:44,790 [as of 1990]
Truck traffic:9% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:79.2 tons [72.0 metric tons]
Inventory rating:37.6 tons [34.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:41.1
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$306,000