Facts 

Name:RTE 221 over TRB E BR OWEGO CK
Structure number:000000001069490
Location:1.2 MI E JCT SH221 & SH38
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:10.8 ft. [3.3 m]
Total length:22.0 ft. [6.7 m]
Roadway width between curbs:30.8 ft. [9.4 m]
Deck width edge-to-edge:34.1 ft. [10.4 m]
Skew angle:30°
Owner:State Highway Agency [01]
Year built:1938
Year reconstructed:1979
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 18 / H 20 [4]
Number of main spans:2
Main spans material:Concrete continuous [2]
Main spans design:Culvert [19]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

Latest Available Inspection: November 2015 

Status:Open, no restriction [A]
Average daily traffic:1,246 [as of 2014]
Truck traffic:13% of total traffic
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Culvert condition:Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:79.5 tons [72.3 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:94.3
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$171,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
November 201594.3Not deficient---1246
October 201394.3Not deficient---1246
October 201194.3Not deficient---1120
October 200994.3Not deficient---1076
November 200794.3Not deficient---1315
November 200594.3Not deficient---1076
October 200394.3Not deficient---1076
October 200194.3Not deficient---1054
October 199995.3Not deficient---1042
October 199769.3Structurally deficient---890
October 199585.0Not deficient---890
October 199385.0Not deficient---901
October 199162.7Structurally deficient---867