Share:

FROM JFK EXPRWY over NASSAU EP EB

Map 

Coordinates:
+40.66510, -73.78791
40°39'54" N, 73°47'16" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:FROM JFK EXPRWY over NASSAU EP EB
Structure number:000000001073070
Location:JCT.NASSAU + JFK EXPRWYS
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:78.7 ft. [24.0 m]
Total length:144.7 ft. [44.1 m]
Roadway width between curbs:24.9 ft. [7.6 m]
Deck width edge-to-edge:27.9 ft. [8.5 m]
Vertical clearance below bridge:15.7 ft. [4.8 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1988
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,000 [as of 2009]
Truck traffic:13% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:88.8 tons [80.7 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:93.5
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$2,073,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,000 [as of 1999]
Truck traffic:10% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:88.8 tons [80.7 metric tons]
Inventory rating:35.9 tons [32.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:95.5
Recommended work:Replacement of bridge or other structure because of relocation of road. [32]
Estimated cost of work:$3,771,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,000 [as of 1991]
Truck traffic:10% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:88.1 tons [80.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:97.2
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$539,000