Facts
| Name: | RTE I278 over GOWANUS EXPWY., HAMILTON |
| Structure number: | 000000001074010 |
| Location: | HAMILTON AVE.RAMP 278IX |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 189.0 ft. [57.6 m] |
| Total length: | 460.0 ft. [140.2 m] |
| Roadway width between curbs: | 26.9 ft. [8.2 m] |
| Deck width edge-to-edge: | 29.5 ft. [9.0 m] |
| Vertical clearance above deck: | 14.8 ft. [4.5 m] |
| Vertical clearance below bridge: | 14.1 ft. [4.3 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1989 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Steel [3] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Integral Concrete (separate non-modified layer of concrete added to structural deck) [2] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 15,475 [as of 2003] |
| Truck traffic: | 13% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Excellent [9 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 62.9 tons [57.2 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 87.0 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $1,665,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 15,000 [as of 1999] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 62.8 tons [57.1 metric tons] |
| Inventory rating: | 35.9 tons [32.6 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 96.0 |
| Recommended work: | Replacement of bridge or other structure because of relocation of road. [32] |
| Estimated cost of work: | $8,610,000 |