RTE 907M over RTE I295, RTE I295, 295I
Map
Coordinates:
+40.72624, -73.7570840°43'34" N, 73°45'25" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | RTE 907M over RTE I295, RTE I295, 295I |
| Structure number: | 000000001076322 |
| Location: | JCT GCP+I78 |
| Purpose: | Carries highway overpass (third level) over highway |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 81.7 ft. [24.9 m] |
| Total length: | 287.7 ft. [87.7 m] |
| Roadway width between curbs: | 19.7 ft. [6.0 m] |
| Deck width edge-to-edge: | 26.6 ft. [8.1 m] |
| Vertical clearance above deck: | 14.4 ft. [4.4 m] |
| Vertical clearance below bridge: | 14.1 ft. [4.3 m] |
| Skew angle: | 99° |
| Owner: | State Highway Agency [01] |
| Year built: | 1963 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 4 |
| Main spans material: | Steel [3] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,327 [as of 2000] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 98.8 tons [89.8 metric tons] |
| Inventory rating: | 71.8 tons [65.3 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 80.0 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $4,437,000 |
2000 Inspection
| Average daily traffic: | 39,000 [as of 1977] |
| Truck traffic: | 7% of total traffic |
| Evaluation: | Not applicable [N] |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,500 [as of 1991] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 73.3 tons [66.6 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 47.0 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $432,000 |