Facts 

Name:RAMP TO GW BRIDGE over RTE I95
Structure number:00000000107696A
Location:JCT I87+I95
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:53.8 ft. [16.4 m]
Total length:54.8 ft. [16.7 m]
Roadway width between curbs:25.6 ft. [7.8 m]
Deck width edge-to-edge:33.1 ft. [10.1 m]
Vertical clearance below bridge:14.4 ft. [4.4 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1961
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Girder and floorbeam system [03]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,028 [as of 2002]
Truck traffic:13% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:75.8 tons [68.9 metric tons]
Inventory rating:52.9 tons [48.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:47.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$891,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,600 [as of 1999]
Truck traffic:4% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:91.7 tons [83.4 metric tons]
Inventory rating:35.9 tons [32.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:47.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$404,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,100 [as of 1991]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:91.1 tons [82.8 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:47.8
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$108,000