Share:

COUNCIL HOUSE RD over GENESEE RIVER

Map 

Coordinates:
+42.40120, -78.15431
42°24'04" N, 78°09'16" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:COUNCIL HOUSE RD over GENESEE RIVER
Structure number:000000002214490
Location:1 MI NORTH OF CANEADEA
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:119.8 ft. [36.5 m]
Total length:310.7 ft. [94.7 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:25.9 ft. [7.9 m]
Skew angle:33°
Owner:Town or Township Highway Agency [03]
Year built:1989
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:384 [as of 2009]
Truck traffic:6% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:67.9 tons [61.7 metric tons]
Inventory rating:40.9 tons [37.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:59.1
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$294,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:436 [as of 1998]
Truck traffic:8% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge is scour critical; field review indicates that extensive scour has occurred at bridge foundations. [2]
Operating rating:77.8 tons [70.7 metric tons]
Inventory rating:49.8 tons [45.3 metric tons]
Sufficiency rating:86.8
Recommended work:Replacement of bridge or other structure because of relocation of road. [32]
Estimated cost of work:$4,778,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:200 [as of 1991]
Truck traffic:10% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Scour calculation/evaluation has not been made. [6]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:80.7
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$1,120,000