JACK BRIDGE ROAD over GENESEE RIVER

Map 

Coordinates:
+42.07587, -77.92466
42°04'33" N, 77°55'29" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:JACK BRIDGE ROAD over GENESEE RIVER
Structure number:000000002215180
Location:0.7 MI S OF STANDARDS
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:140.8 ft. [42.9 m]
Total length:143.7 ft. [43.8 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:27.9 ft. [8.5 m]
Skew angle:15°
Owner:Town or Township Highway Agency [03]
Year built:1984
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:346 [as of 2009]
Truck traffic:6% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inventory rating:74.8 tons [68.0 metric tons]
Sufficiency rating:94.4
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$180,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:510 [as of 1998]
Truck traffic:8% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:92.7 tons [84.3 metric tons]
Inventory rating:45.9 tons [41.7 metric tons]
Sufficiency rating:94.4
Recommended work:Replacement of bridge or other structure because of relocation of road. [32]
Estimated cost of work:$1,250,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:400 [as of 1990]
Truck traffic:10% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:There are no noticeable or noteworthy deficiencies which affect the condition of the channel. [9]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:92.1 tons [83.7 metric tons]
Inventory rating:45.5 tons [41.4 metric tons]
Sufficiency rating:93.9
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$101,000