Facts 

Name:STEVENS STREET over GENESEE RIVER
Structure number:000000002215520
Location:IN WELLSVILLE
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:102.7 ft. [31.3 m]
Total length:212.9 ft. [64.9 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:40.4 ft. [12.3 m]
Skew angle:99°
Owner:Town or Township Highway Agency [03]
Year built:1974
Year reconstructed:1995
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,188 [as of 2009]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:69.9 tons [63.5 metric tons]
Inventory rating:41.9 tons [38.1 metric tons]
Sufficiency rating:81.8
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$2,891,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,354 [as of 1998]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:69.9 tons [63.5 metric tons]
Inventory rating:41.9 tons [38.1 metric tons]
Sufficiency rating:70.8
Recommended work:Replacement of bridge or other structure because of relocation of road. [32]
Estimated cost of work:$4,591,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,800 [as of 1986]
Truck traffic:10% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:There are no noticeable or noteworthy deficiencies which affect the condition of the channel. [9]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:82.2 tons [74.7 metric tons]
Inventory rating:44.6 tons [40.5 metric tons]
Sufficiency rating:70.7
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$143,000