Share:

AT SUMMIT AVE over RTE I278, RTE I278, HICK

Map 

Coordinates:
+40.68228, -74.00240
40°40'56" N, 74°00'09" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:AT SUMMIT AVE over RTE I278, RTE I278, HICK
Structure number:000000002230350
Location:.2 MI NE I278+BATTERY
Purpose:Carries pedestrian/bicycle trail over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:78.7 ft. [24.0 m]
Total length:121.7 ft. [37.1 m]
Year built:1952
Main span material:Steel continuous [4]
Main span design:Stringer/Multi-beam or girder [02]

2010 Inspection 

Average daily traffic:128,825 [as of 2002]
Truck traffic:13% of total traffic

2000 Inspection 

Average daily traffic:127,303 [as of 1998]
Truck traffic:7% of total traffic
Evaluation:Not applicable [N]

1992 Inspection 

Status:Open, no restriction [A]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:58.2 tons [52.9 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:57.6
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$83,000