Facts 

Name:ROOSEVELT IS BRDG over 36TH AVE, EAST RIVER, RO
Structure number:000000002240640
Location:ROOSEVELT ISLND IN EAST R
Purpose:Carries highway and pedestrian walkway over highway and waterway
Route classification:Collector (Urban) [17]
Length of largest span:418.0 ft. [127.4 m]
Total length:938.0 ft. [285.9 m]
Roadway width between curbs:34.1 ft. [10.4 m]
Deck width edge-to-edge:41.3 ft. [12.6 m]
Vertical clearance above deck:14.4 ft. [4.4 m]
Vertical clearance below bridge:39.7 ft. [12.1 m]
Owner:City or Municipal Highway Agency [04]
Year built:1955
Year reconstructed:2008
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:M 18 / H 20 [4]
Number of main spans:8
Main spans material:Steel [3]
Main spans design:Movable - Lift [15]
Deck type:Closed Grating [4]
Wearing surface:Bituminous [6]

Latest Available Inspection: November 2015 

Status:Posted for load [P]
Average daily traffic:8,417 [as of 2011]
Truck traffic:9% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Equal to present minimum criteria [6]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:36.0 tons [32.7 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:72.5
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$78,130,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
November 201572.5Not deficientVery GoodGoodGood8417
October 201472.5Not deficientExcellentVery GoodVery Good8417
November 201372.5Not deficientExcellentVery GoodVery Good8338
November 201272.5Not deficientExcellentSatisfactoryVery Good8300
November 201172.7Not deficientExcellentSatisfactoryVery Good4664
December 201072.5Not deficientExcellentSatisfactoryVery Good8218
November 200871.5Not deficientExcellentSatisfactorySatisfactory8218
December 200667.8Structurally deficientPoorSatisfactorySatisfactory8839
June 200468.0Structurally deficientPoorSatisfactorySatisfactory4664
June 200268.8Structurally deficientPoorSatisfactorySatisfactory8196
March 200068.7Structurally deficientPoorSatisfactorySatisfactory10368
April 199968.7Structurally deficientPoorSatisfactorySatisfactory10368
May 199868.8Structurally deficientPoorSatisfactorySatisfactory7573
June 199730.6Structurally deficientPoorFairSerious7573
July 199629.4Structurally deficientPoorPoorSerious8787
June 199447.6Structurally deficientPoorPoorPoor8787
August 199347.6Structurally deficientPoorPoorPoor8787
August 199247.6Structurally deficientPoorPoorPoor8787
October 199045.5Structurally deficientPoorPoorPoor8787