HUNTS POINT AVE over AMTRAK/CSXT/P&W
Map
Coordinates:
+40.81960, -73.8899740°49'11" N, 73°53'24" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | HUNTS POINT AVE over AMTRAK/CSXT/P&W |
| Structure number: | 000000002241190 |
| Location: | AT HUNTS POINT |
| Purpose: | Carries highway and pedestrian walkway over railroad |
| Route classification: | Minor Arterial (Urban) [16] |
| Length of largest span: | 98.8 ft. [30.1 m] |
| Total length: | 105.0 ft. [32.0 m] |
| Roadway width between curbs: | 69.9 ft. [21.3 m] |
| Deck width edge-to-edge: | 97.4 ft. [29.7 m] |
| Vertical clearance below bridge: | 23.6 ft. [7.2 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1908 |
| Year reconstructed: | 1992 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Main span material: | Steel [3] |
| Main span design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 12,035 [as of 1998] |
| Truck traffic: | 13% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 72.8 tons [66.2 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Sufficiency rating: | 96.4 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $3,285,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 12,035 [as of 1998] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 98.8 tons [89.8 metric tons] |
| Inventory rating: | 98.8 tons [89.8 metric tons] |
| Sufficiency rating: | 97.4 |
| Recommended work: | Replacement of bridge or other structure because of relocation of road. [32] |
| Estimated cost of work: | $3,161,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 27,400 [as of 1973] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Serious [3 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 81.2 tons [73.8 metric tons] |
| Inventory rating: | 48.5 tons [44.1 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 43.9 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $1,901,000 |