Share:

WEST 205TH STREET over NYCTA IND YARDS

Map 

Coordinates:
+40.87627, -73.88811
40°52'35" N, 73°53'17" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:WEST 205TH STREET over NYCTA IND YARDS
Structure number:000000002241940
Location:AT KINGSBRIDGE
Purpose:Carries highway and pedestrian walkway over railroad
Route classification:Collector (Urban) [17]
Length of largest span:117.8 ft. [35.9 m]
Total length:387.2 ft. [118.0 m]
Roadway width between curbs:59.7 ft. [18.2 m]
Deck width edge-to-edge:84.0 ft. [25.6 m]
Vertical clearance below bridge:13.1 ft. [4.0 m]
Skew angle:99°
Owner:Other Local Agencies [25]
Year built:1935
Year reconstructed:2000
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:4
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,972 [as of 2009]
Truck traffic:6% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:97.8 tons [88.9 metric tons]
Inventory rating:49.9 tons [45.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:90.6
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$7,820,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,068 [as of 1997]
Truck traffic:4% of total traffic
Deck condition:Excellent [9 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:68.8 tons [62.5 metric tons]
Inventory rating:42.9 tons [39.0 metric tons]
Sufficiency rating:78.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$7,426,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,200 [as of 1972]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Serious [3 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:74.2 tons [67.5 metric tons]
Inventory rating:45.5 tons [41.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:30.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$5,551,000